-
Monday, October 27 through Friday, October 31, from 9 a.m. to 4 p.m.: Motorists should expect intermittent westbound outside lane closures on U.S. 192 from Nova Road to Arthur J Gallagher Boulevard for drainage and pipe work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.
-
Monday, November 3 through Wednesday, November 5, from 7 a.m. to 4 p.m.: Motorists should expect a road closure at the intersection of U.S. 192 and Waypoint Boulevard for drainage and pipe work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.
-
Tuesday, October 28, from 7 a.m. to 4 p.m.: Motorists should expect a road closure at the intersection of U.S. 192 at Bradley Drive for drainage and pipe work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.
-
Monday, October 20th through Saturday, October 25th, 9 a.m. to 4 p.m.: Motorists should expect westbound lane closures on U.S. 192 from C.R. 532 (Nova Road) to Arthur J Gallagher Blvd. to for pipe work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.