EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Project
Phase: Design
Limits: Marion Avenue Intersection
Length: 0.01 miles
City:
County:
Road:
Letting: 04/01/2024
Estimated Costs
Construction Cost: $110,000
About

The purpose of this project is to enhance safety by converting the full median opening on South Ridgewood Avenue (U.S. 1) and Marion Avenue in Edgewater, Volusia County, to a two-way directional median opening. These improvements will enhance access control, traffic flow, and reduce the possibility of crashes.

These proposed improvements will continue to allow U-turns for both northbound and southbound traffic on South Ridgewood Avenue. Northbound traffic will be able to turn left onto W. Marion Avenue. Southbound traffic will also be able to turn left onto E. Marion Avenue. Right turns will only be possible from Marion Avenue onto South Ridgewood Avenue. New pavement markings and signage will be installed to direct drivers.

 

07/19/2024 Project Update: 

After further study of the intersection, the Department found that changing the full median opening at South Ridgewood Avenue and Marion Avenue to a two-way directional median opening will enhance safety, access control, traffic flow, and reduce the possibility of crashes. Therefore, FDOT has concluded that the best course of action is to proceed with the design as proposed. Design plans for these improvements are progressing, and construction is expected to commence in 2025.

Get Involved

The public meeting for this project was held on Wednesday, October 18, 2023. More information about the project is available in the files below.

Contact Information
Design Project Manager
Richard Smith
(386) 943-5326
Richard.Smith@dot.state.fl.us
Project Files