EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Maintenance Resurfacing
Phase: Design
City:
County:
Road:
Letting: 10/05/2027
Estimated Costs
Construction Cost: $4.9 Million
About

The Florida Department of Transportation (FDOT) plans to repave a segment of State Road (S.R.) 438 from Franklin Street to Silver Bend Boulevard at Ocoee Landings in Ocoee to maintain a safe and reliable driving surface. The project begins at the intersection of Franklin Street and Ocoee Apopka Road (S.R. 437) and travels north on Ocoee Apopka Road to Silver Star Boulevard before continuing east on Silver Star Boulevard. 

The project will also evaluate and reconstruct sidewalk curb ramps where possible to comply with current Americans with Disabilities Act (ADA) standards.

Contact Information
Design Project Manager
Angela Cardona
(386) 943-5163
Angela.Cardona@dot.state.fl.us
BESbswy