Project Details
Work Type: Median Modification
Phase: Design
Length: 2.216 miles
County:
Road:
Design Cost: $499,000
Letting: 03/31/2027
Estimated Costs
Construction Cost: $2.1 Million
About

The goal of the project is to enhance safety along North Courtney parkway (State Rad (S.R.) 3) from Catalina Isle Drive to the S.R. 528/S.R. A1A eastbound on ramp in Merritt Island. The proposed concept would replace the existing center two-way left turn lane with a raised median to reduce the chances for severe head on and angle crashes. Median openings and left turn lanes will be provided to accommodate access.

The concept is consistent with the existing roadway configuration on North Courtenay Parkway to the south.

Contact Information
Design Project Manager
Gene Varano
(386) 943-5145
Gene.Varano@dot.state.fl.us
Design Firm
Pegasus Engineering, LLC