EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Phase: Design
Length: 5.436 miles
County:
Road:
Design Cost: $502,000
Letting: 10/06/2026
Estimated Costs
Construction Cost: $4 Million
About

The purpose of this project is to repave a State Road (S.R.) 46 from the Brevard County line to the Seminole County line in Volusia County to rehabilitate the asphalt and maintain a safe and reliable driving surface.

Contact Information
Design Firm
Garrett Engineering Group, Inc.
Design Project Manager
Jude Jean-Francois
(386) 943-5487
Jude.Jean-Francois@dot.state.fl.us