Project Details
Work Type: Resurfacing
Phase: Design
Length: 2.114 miles
City:
County:
Road:
Design Cost: $578,000
Letting: 08/04/2026
Estimated Costs
Construction Cost: $4.4 Million
About

The Florida Department of Transportation (FDOT) plans to make improvements along State Road (S.R. 44) from west of I-95 to east of South Walker Drive in New Smyrna Beach. This project will resurface the corridor, fill in sidewalk gaps, minor drainage improvements, and upgrade curb ramps, as needed, to meet Americans with Disabilities Act (ADA) standards. Also included is the reconstruction of the existing traffic signal at Sugar Mill Drive.

Contact Information
Design Project Manager
Randy Turner
(386) 943-5207
Randall.Turner@dot.state.fl.us
Design Firm
SRD, Inc.