Project Details
Work Type: Resurfacing
Phase: Design
Length: 0.511 miles
City:
County:
Road:
Design Cost: $481,000
Letting: 07/01/2025
Estimated Costs
Construction Cost: $529,000
About

This is a maintenance resurfacing project Orange Avenue (State Road (S.R.) 527) from Magnolia Avenue to Colonial Drive (S.R. 50) in Orlando. The project will also upgrade pedestrian curb ramps as needed to comply with current Americans with Disabilities Act (ADA) standards.

There is an exception area from Legion Place to south of Park Lake Street. Part of the exception area was recently resurfaced.  Another area is being excluded to accommodate upcoming utility work, which will include resurfacing.

Contact Information
Design Project Manager
Samuel Jumber
(386) 943-5244
Samuel.Jumber@dot.state.fl.us
Design Firm
Johnson, Mirmiran & Thompson