EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Design
Length: 1.443 miles
City:
County:
Road:
Design Cost: $1.3 Million
Letting: 08/06/2024
Estimated Costs
Construction Cost: $4.9 Million
About

This project intends to implement operational and safety improvements along Silver Star Road (State Road (S.R.) 416) from Princeton Street (S.R. 438) to Orange Blossom Trail (U.S. 441).  In addition to repaving the roadway, the project will install a raised traffic separator along Silver Star Road east of the John Young
Parkway (S.R. 423) intersection, as well as channelizing islands at the Hansrob Road and the Wawa
driveway, which will restrict left turns onto Silver Star Road at these locations.

Traffic signal and pedestrian signal upgrades at Princeton Street, Eunice Avenue, and Mercy Drive are also proposed. Pedestrian and bicycle safety improvements along the project corridor are also planned. These include constructing a new crosswalk on Silver Star Road near Princeton Street (S.R. 438), filling in sidewalk gaps and improving bicycle connectivity along the paved shoulders where possible, providing bus stops, and
reconstructing curb ramps to meet current Americans with Disabilities Act (ADA) standards.

Lighting improvements are proposed at the signalized crosswalks at Princeton Street, Eunice Avenue, and Mercy Drive, as well as new signing and pavement marking features.

 

Contact Information
Design Firm
Arcadis U.S., Inc.
Design Project Manager
Aleacia Spann
(386) 943-5234
Aleacia.Spann@dot.state.fl.us
Project Files