EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Length: 1.397 miles
City:
County:
Road:
Construction Cost: $3.6 Million
Project Start: Early 2025
Est. Completion: Summer 2025
About

The Florida Department of Transportation (FDOT) is repaving the southbound lanes of U.S. 1 (North Washington Avenue/ South Hopkins Avenue/ Edison Avenue) from the Florida East Coast (FEC) railway bridge to Grace Street in Titusville. The resurfacing will extend the life of the existing roadway.

Additionally, the project will include traffic signal upgrades at State Road (S.R.) 406 (Garden Street), Main Street, Julia Street, S.R. 405 (South Street), and Grace Street. To improve pedestrian safety, the project will improve crosswalks, reconstruct pedestrian curb ramps to meet current Americans with Disabilities Act (ADA)standards, and construct sidewalks connecting to the existing bus stops.

Contact Information
Communications Team
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.
Project Files