Project Details
Work Type: Resurfacing
Phase: Design
Length: 4.139 miles
City:
County:
Road:
Design Cost: $1 Million
Letting: 12/03/2024
Estimated Costs
Construction Cost: $7.2 Million
About

The purpose of this project is to repave Pineda Causeway (State Road (S.R.) 404) from U.S. 1 to S.R. A1A in Merritt Island. The interchange ramps at U.S. 1, County Road (C.R.) 3 (South Tropical Trail), and S.R. 513 (S. Patrick Drive) are included within the resurfacing limits.

Other improvements include adding wrong way detection on the ramps that don’t already have the technology, adding bike lanes next to the right turn lane (keyhole lane) at the S.R. A1A intersection and updating the pavement markings for the bike lanes.

Contact Information
Design Firm
Dewberry Engineers, Inc.
Design Project Manager
Aleacia Spann
(386) 943-5284
Aleacia.Spann@dot.state.fl.us
Project Files