447608-1 East Coast Greenway/US 1 Trail from SR 50 to Grace St
Project Details
Work Type: | Trail |
---|---|
Phase: | Design |
Length: | 3.05 miles |
City: | |
County: | |
Road: | |
Design Cost: | $900,000 |
About
The project proposes to construct a shared-use path along the northbound side of U.S. 1 from State Road (S.R.) 50 (Cheney Highway) to Grace Street in Titusville. The path would be a segment of the East Coast Greenway trail system. Initial design efforts will include evaluating the concept with respect to drainage, right of way and other impacts.
Contact Information
Design Project Manager |
---|
Blaire Scheller
(386) 943-5232
Blaire.Scheller@dot.state.fl.us
|
Design Firm |
Keith and Associates, Inc.
|