EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Project
Phase: Construction
Length: 4.322 miles
City:
County:
Road:
Construction Cost: $3.9 Million
Project Start: Spring 2024
Est. Completion: Early 2025
About

The Florida Department of Transportation (FDOT) is enhancing pedestrian safety along State Road (S.R.) A1A from Crescent Beach Drive to south of Minutemen Causeway. In this area, S.R. A1A is split, with S.R. A1A northbound known as Atlantic Avenue and S.R. A1A southbound known as Orlando Avenue. The project proposes to construct pedestrian crossings along S.R. A1A. Two of the crossings - on northbound and southbound S.R. A1A at South 1st Street -- will be equipped with Pedestrian Hybrid Beacons (PHBs).

A public meeting about this project was held on March 1, 2022. Please see the public meeting information in the files below.

Contact Information
Contractor
Carr Construction, LLC
Communications Team
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
Lane Closures
  • 7 a.m. Monday, November 18, through 5 p.m. Friday, November 22

    Motorists can expect single inside and outside lane closures northbound and southbound S.R. A1A from Minuteman Causeway to Crescent Beach Drive.

    These closures are needed for miscellaneous construction activities.

    Please slow down and proceed with caution while driving through construction zones.

Goes With
Project Files