Project Details
Work Type: Resurfacing
Phase: Construction
Length: 2.207 miles
County:
Road:
Construction Cost: $5.6 Million
Project Start: Summer 2024
Est. Completion: Spring 2025
About

PROJECT DESCRIPTION

The Florida Department of Transportation (FDOT) project is resurfacing U.S. 301 (State Road (S.R.) 35) from north of County Road (C.R.) 42 to north of Southeast 144th Place Road to extend the life of the existing roadway.

Safety and operational improvements will also be implemented, including the installation of a new traffic signal at the intersection of U.S. 301 and Southeast 147th Street. Additional enhancements include widening shoulders at select locations, drainage upgrades, providing bicycle through lanes (also known as keyholes) next to right turn lanes, guardrail reconstruction, and new lighting at the curve from north of Southeast 147th Street to Southeast 144th Place Road.

Audible and vibratory pavement markings will be added along the shoulders in specific areas to enhance safety. New signs and pavement markings will be installed throughout the corridor.

WHAT TO EXPECT

Daytime and nighttime work is expected. During construction, motorists should expect  planned overnight lane closures (7 p.m. to 7 a.m.) when needed and possible detours. Electronic message boards and other signage will direct traffic through the work zone.

Where driveway reconstruction and mailbox relocation are necessary, property owners will be appropriately notified. Uneven pavement is a common condition with projects that require temporary asphalt or resurfacing, as the contractor must place several layers of asphalt over the course of construction. Motorists should reduce their speed, heed posted signage, and remain alert throughout the work zone.

The construction schedule is subject to change due to weather or unexpected circumstances.

Contact Information
Communications Team
Joe Callahan
(352) 326-7744 / (352) 620-3020
Joe.Callahan@dot.state.fl.us
Lane Closures
  • Sunday, December 15, through Saturday, December 22, from 7 p.m. to 6 a.m.: Motorists should be advised that overnight rotating northbound and southbound lane closures for roadway and shoulder reconstruction, and resurfacing..

    *Lane closures are subject to change due to unforeseen events and weather.