445215-1 US 1 (SR 5) from Post Road to Miller Cove Road
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Construction |
Length: | 1.642 miles |
City: | |
County: | |
Road: | |
Construction Cost: | $11.3 Million |
Project Start: | Early 2024 |
Est. Completion: | Spring 2025 |
About
The Florida Department of Transportation (FDOT) is milling and resurfacing U.S. 1 (State
Road (S.R.) 5) from Post Road to Pineda Causeway (S.R. 404) in Palm Shores, and
rehabilitating the existing drainage outfall to the Indian River on U.S. 1 at Madrid Drive,
reconstructing the portions of the outfall that are beyond rehabilitation.
To help encourage safer driving speeds and create a protected bicycle lane, the project is installing raised curb along the outside lane. The curbs help to keep vehicles from entering the bicycle lane, which enhances safety for bicyclists.
The project will also make improvements to interconnect the traffic signals for approximately 1.8 miles south of the project between the signalized intersections of Lake Washington Road, Parkway Drive and Post Road. The interconnected signals allow the county to make coordinated updates in signal timing as needed to improve operation.
Contact Information
Contractor |
---|
OHLA USA, Inc.
|
Communications Team |
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.