EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Length: 1.41 miles
City:
County:
Road:
Construction Cost: $4.8 Million
Project Start: Spring 2024
Est. Completion: Early 2025
About

The Florida Department of Transportation (FDOT) is milling and resurfacing South Street (State Road 405) from south of Bobbi Lane to north of Swan Lake Drive to extend the life of the roadway. Pedestrian safety improvements include replacing the existing 6-foot-wide sidewalk with an 8-feet-wide path along the west side of South Street, which will extend the existing 8-foot-wide path from Fox Lake Road to North of Swan Lake Drive. A new 6-foot-wide sidewalk will also be constructed along the east side of South Street from Fox Lake Road to North of Joe Murell Drive.

Other improvements include upgrades to intersection lighting, improved crosswalks with median refuge areas, upgraded transit stops, and minor widening at turn lanes to provide bicycle through lanes. Additionally, the project plans to help encourage safer driving speeds by introducing small curves in the road, reducing lane widths, adding raised medians, and replacing the two-way-left-turn lanes with dedicated left turn lanes and spot medians throughout the corridor. The raised medians will not impact access to any side streets or driveways.

Contact Information
Contractor
V. A. Paving, Inc.
Communications Team
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.
Project Files