Project Details
Work Type: Resurfacing
Phase: Construction
Length: 0.997 miles
City:
County:
Road:
Construction Cost: $4.7 Million
Project Start: Early 2024
Est. Completion: Early 2025
About

The purpose of this job is to resurface South Orange Avenue (State Road 527) from Grant Street to Gore Street. In addition to repaving the roadway, the project plans to extend curb lines in certain areas to better define on-street parking and improve sight lines for traffic turning onto Orange Avenue from side streets. Short, raised traffic separators are also planned within the existing center two-way left turn lane at four locations: south of Lake Beauty Drive, south of Copeland Drive, near Underwood Street and north of Annie Street. Improved crosswalks and new pedestrian lighting is also planned, along with decorative sidewalk and crosswalk features in conjunction with the Pulse Memorial.

Contact Information
Communications Team
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
Lane Closures
  • Monday, Jan. 7 and Tuesday, Jan. 8 from 8 p.m. to 6 a.m.: Motorists can expect inside and left turn lane closures from Gore Street to Annie Street for cable installation and removal. FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Wednesday, Jan. 9 and Thursda,y Jan. 10 from 8 p.m. to 6 a.m.: Motorists can expect inside and turn lane closures from Annie Street to Underwood Street for signal cable removal and mast arm installation.   FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Monday, Jan. 14 from 8 p.m. to 6 a.m.:  Motorists can expect inside lane and left turn lane closures from Gore Street to Annie Street for signal cable installation and removal.  FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Wednesday, Jan. 16 from 8 p.m. to 6 a.m.: Motorists can expect inside and left turn lane closures from Fernwood Street to Lake Beauty for pedestrian signage activation and vehicle detection system installation· FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Thursday Jan. 17 from 8 p.m. to 6 a.m.: Motorists can expect inside and left turn lane closures from Pennsylvania Street to West Esther Street for pedestrian signage activation and vehicle detection system installation. FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Sunday,  Jan. 5 from 8 p.m. to 5 a.m.: Motorists can expect southbound intermittent single-lane closures on Orange Avenue for grinding and striping work. FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Monday Dec. 16 through Thursday Dec. 19 from 8 p.m. to 6 a.m.: Motorists can expect a southbound and northbound outside and median double lane closure from Hollenbeck St. to Silver Ct. for utility work.  FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!

  • Monday, Dec. 16 to Thursday, Dec. 19 from 8 p.m. to 6 a.m.: Motorists can expect northbound and southbound inside and median lane closures from Hollenbeck Street to Silver Court for concrete work.