EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Traffic Study
Phase: Planning
City:
County:
About

The U.S. 92 Corridor Management Plan Update Study was conducted to analyze the beachside section of U.S. 92 (International Speedway Boulevard), from the Halifax River Bridge to S.R. A1A (Atlantic Avenue) in Daytona Beach.

This study was built upon the previous prepared U.S. 92 Corridor Master Management Plan completed in 2015.  This study included a comprehensive evaluation of the corridor and determined a context sensitive recommended alternative. Extensive coordination was conducted with local and regional agency partners as well as the public and local communities to determine the recommended alternative. Information on the U.S. 92 Corridor Master Management Plan can be found by utilizing the following link: 437398-1 US 92/ISB Corridor Master Management Plan (cflroads.com)

Recommendations associated with the preferred alternative are currently unfunded. For information related to the design phase, please follow path:  437942-1 International Speedway Blvd (US 92) from the Halifax River Bridge to SR A1A (cflroads.com)

Contact Information
Planning Project Manager
David Graeber
(386) 943-5392
David.Graeber@dot.state.fl.us
Project Files