437398-1 US 92/ISB Corridor Master Management Plan
Project Details
Work Type: | Traffic Study |
---|---|
Phase: | Planning |
County: |
About
The purpose of the US 92/ISB Corridor Master Management Plan Study from US 92 (International Speedway Boulevard) from Interstate 4 (I-4) to State Road (S.R.) A1A (Atlantic Avenue) in Volusia County was to develop a comprehensive master plan to guide and coordinate FDOT safety, enhance transit, congestion management and economic development investments along the U.S. 92 (International Speedway Boulevard) corridor. The study was completed December 2015.
UPDATE: As a result of the Corridor Master Management Plan, the U.S. 92 Beachside Study was conducted analyzing the section of U.S. 92 (International Speedway Boulevard) from the Halifax River Bridge to State Road (S.R.) A1A.
All project related files can be found by utilizing the following path: 437398-2 US 92/ISB Beachside (cflroads.com)
Contact Information
Planning Project Manager |
---|
David Graeber
(386) 943-5392
David.Graeber@dot.state.fl.us
|