This project has been completed and is only available for historical reference.
Project Details
Work Type: Widening
Phase: Completed
Length: 2.045 miles
County:
Road:
Construction Cost: $26.3 Million
Project Start: Fall 2021
Est. Completion: Summer 2024
About

The Florida Department of Transportation (FDOT) widened State Road (S.R.) 50 from two to four lanes between the Hernando/Sumter County Line and east of County Road (C.R.) 478A. The work consisted of building 12-foot-wide travel lanes with 5-foot-wide paved shoulders in each direction and a two-lane bridge adjacent to the existing bridge over the Little Withlacoochee River.

Additionally, a 12-foot-wide shared-use path with a 30-foot grassed median was built on the south side of the roadway. Other improvements included road resurfacing and drainage improvements. The purpose of this project was to accommodate the increased traffic demand and improve safety along the corridor.

Contact Information
Communications Team
Joe Callahan
(352) 326-7744 / (352) 620-3020
Joe.Callahan@dot.state.fl.us
Contractor
Ranger Construction Industries, Inc.
For Media Inquiries Only
FDOT-D5Comm@dot.state.fl.us
Project Files