EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Widening
Phase: Design
Length: 2.092 miles
City:
County:
Road:
Estimated Costs
ROW Cost: $2.6 Million
Construction Cost: $42 Million
About

The project consists of reconstructing and widening State Road (S.R.) 44 (County Road 44B) from U.S. 441 to S.R. 44. The proposed concept would provide two 11-foot-wide travel lanes in each direction separated by a median. An improved, closed drainage system, as well as bicycle lanes and sidewalks along both sides of the corridor, are included.

This project is not yet funded for construction.

Contact Information
Design Firm
AECOM Consult, Inc.
Design Project Manager
Ryan Frazier
(386) 943-5591
Ryan.Frazier@dot.state.fl.us
Project Files