Project Details
Work Type: Resurfacing
Phase: Design
Length: 2.461 miles
County:
Road:
Design Cost: $581,000
Letting: 12/01/2026
Estimated Costs
Construction Cost: $5 Million
About

The purpose of this project is to maintain the roadway along North Orange Blossom Trail (U.S. 441/SR 600/SR 500) from north of County Road 527 (Old Dixie Highway) to the Orange County Line (south of Mary Louis Lane) in Osceola County. In addition to repaving the travel lanes and shoulders, the project will replace pedestrian curb ramps as needed in accordance with current Americans with Disabilities Act (ADA) standards.