EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

This project has been completed and is only available for historical reference.
Project Details
Work Type: Safety Project
Phase: Completed
Length: 1.506 miles
City:
County:
Road:
Construction Cost: $4 Million
Project Start: Spring 2023
Est. Completion: Early 2024
About

The purpose of this project is to improve traffic operations and safety along State Road (S.R.) A1A by adding midblock crossings and raised medians within the corridor from Milsap Road to Granada Boulevard (S.R. 40) in Ormond Beach.

The project plans to construct seven new pedestrian crossings equipped with Rectangular Rapid Flashing Beacons (RRFBs) at:

  • Milsap Road
  • Benjamin Drive
  • River Beach Drive
  • Arlington Way
  • Ormond Parkway
  • Osceola Avenue
  • Bosarvey Drive

The new mid-block crossings located near Milsap Road and Bosarvey Drive will be slightly elevated to be level with the sidewalk, which will put pedestrians in a more visible position to motorists and slow traffic.

To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:

Rectangular Rapid Flash Beacon (video)

RRFB Tip Card (English)

RRFB Tip Card (Spanish)

A new crossing is also proposed at Rockefeller Drive and will be equipped with a Pedestrian Hybrid Beacon (PHB). To learn more about Pedestrian Hybrid Beacons (PHBs), including how to use them:

New Pedestrian Safety Signals (video)

A public hearing for the project was held on December 3, 2020. Please see hearing documents below. Based on public feedback, revisions have been made to the project design plans. 

A public meeting for this project was held on January 12, 2022. Please see the public meeting information in the files below.

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Contractor
Halifax Paving, Inc.
Project Files