The existing swing truss bridge is to be relocated and made a pedestrian bridge. A new vehicle bridge is to be installed on the existing alignment along with built-up road approaches and retaining walls.

News

Currently working with Ocala Utility Electric on location of transmission poles. Coordination is still ongoing.

Project Details
Phase:
Design
Work Type:
Construction
Length:
0.59
City:
County:
Current Schedule
Design Schedule:
View
Letting:
10/21/2010
Estimated Costs
ROW:
$400,000
Construction:
$8.00 million