> Project Description

Project Number: 405506-3-52-01
Roadway Description: I-95 from South of Malabar Rd to Palm Bay Rd


View Current Projects - Brevard County in a larger map

About this Project:
  • Widen from 4 to 6 lanes from S. of SR 514 (Malabar Rd.) to N. of CR 516 (Palm Bay Rd.) (MP 12.415 – 16.588), mill & resurface existing pavement including ramps at Malabar Rd. and Palm Bay Rd., and Accel/Decel lanes at all ramps.
  • Drainage work to include ponds within FDOT Right-of-Way.
  • Structural work to include modifications to I-95 bridge over Malabar Rd., widening of Melbourne-Tillman Canal bridges, and cantilever sign foundations.
  • ITS work to include necessary modifications to existing infrastructure.
  • Upgrade signing and/or lighting to current FDOT standards at SR 514 (Malabar Rd.), CR 516 (Palm Bay Rd.), SR 500 (US 192), SR 518 (Eau Gallie Blvd.), and SR 528 (Beach Line) interchanges.
  • Underdeck bridge lighting.

Project Details:

• Contract #: E5N19
• County: Brevard
• Total Cost: $20,500,000.00
• Est. Completion: Winter 2010
• Contractor: Ranger Construction Industries, Inc. / C3TS
• Project Website:

Not Available


Contact Person:

Steve Olson, (321) 690-2187, (386) 943-5479
Send Comments and Questions: Here

Lane Closures:

September 5, 2010 - September 11, 2010 ~ LABOR DAY 9/4-6/10

  • 09/07/10 -09/10/10, Tuesday - Friday
  • 8pm - 6am
  • Nighttime lane closures on mainline I-95 northbound and southbound for preparation of median construction.
  • Intermittent shoulder closures for various lighting activities and drilled shaft work.
  • Various closures along I-95 for barrier wall removal.

 

 

August 29, 2010 - September 4, 2010 ~ LABOR DAY 9/4-6/10

  • 08/30/10 -09/03/10, Monday - Friday
  • 8pm - 6am
  • Nighttime lane closures on mainline I-95 northbound and southbound for preparation of median construction.
  • Intermittent shoulder closures for various lighting activities and drilled shaft work.
  • Various closures along I-95 for barrier wall removal.