> Project Description

Project Number: 238423-1-52-01
Roadway Description: US 27 from north of Lake Louisa to north of Cluster Oak Drive


View Current Projects - Lake County in a larger map

About this Project:
This project consists of widening and reconstruction from a four-lane rural roadway to a six-lane suburban and urban divided roadway with curbed grass medians and sidewalks from north of Lake Louisa Road to north of Cluster Oak Drive. Milling and resurfacing pavement of existing four-lanes are included. Open and closed drainage system to include 5 ponds within FDOT Right-of-Way. Structural work to include Right-of-Way retaining walls, box culvert extensions, and cantilever sign foundations. Signalization work to include strain poles at Hartwood Marsh Rd., interconnect from Hartwood Marsh Rd. to end of project, and Traffic Monitoring Sites with signing and pavement markings
Project Details:

• Contract #: E5N42
• County: Lake
• Total Cost: $20 Million
• Est. Completion: Fall 2011
• Contractor: Prince Contracting, LLC
• Project Website:

Not Available


Contact Person:

Steve Olson, (352) 427-4054, (386) 943-5479
Send Comments and Questions: Here

Lane Closures:

September 5, 2010 –September 11, 2010
  • No lane closures anticipated
August 29, 2010 – September 4, 2010
  • Northbound and southbound lane closures
  • 7 pm - 7 am